|
|
 | | Published 3,274 days ago | Construction crews place pipe before machine bores shaft under railroad tracks
Construction workers place a piece of pipe in line so a boring machine can drive its bit through the ground at a site in Carbonville. The water line shaft is being installed under the Union Pacific tracks so that there will be three lines feeding the area served. When crews complete the bore, the pipe will be fitted through the casing and attached to the present water delivery system on the other side of Carbonville Road.
|
| |
 | Related Articles |
| | Related Stories
|
Best viewed with Firefox  |
|
|
| © Sun Advocate, 2000-2013. All rights reserved. All material found on this website, unless otherwise specified, is copyright and may not be reproduced without the explicit written permission from the publisher of the Sun Advocate. |
 |
|
|
 |
|
 |
|